Main Content

Features

Bridge Drills to Big Water: Crews Master Hose Lays and Supply Operations

This article is a direct street report from our correspondent and has not been edited by the 1st Responder newsroom.

Waitsfield, VT - The Waitsfield-Fayston Fire Department conducted a focused training session simulating a fire scenario on the opposite side of a bridge, emphasizing strategic truck placement and rapid water supply operations under access-limited conditions.


On September 2, 2026, in Washington County, Vermont, crews worked through the challenges posed by the bridge restriction, which prevents heavier apparatus from crossing. Firefighters practiced establishing a reliable water supply by connecting a hydrant-fed engine on one side while deploying hand-laid hose lines through the bridge to support apparatus positioned on the far side.


The evolution involved coordination between three trucks operating in sequence to maintain continuous water flow toward the simulated ski club fire scenario. Crews refined techniques for hose advancement, pump operations, and relay supply, ensuring water delivery could be established quickly despite the physical barrier.


Throughout the drill, firefighters held brief tactical discussions and on-scene huddles to evaluate hose layouts and improve operationl efficiency. These moments of collaboration helped reinforce decison-making and ensured the development of a practical, repeatable plan for real-world incidents in similar terrain-limited environments.

avatar image
1RN News Team

No information from the author.