news
Barre Fire Department Completes Apparatus Flow Testing
September 24, 2025 | MASSACHUSETTS
Courtesy of Barre Fire Department, Correspondent

Photo by Barre Fire Department Barre Fire Department conducted flow testing
This article is a direct street report from our correspondent and has not been edited by the 1st Responder newsroom.
Sept. 24, 2025 — The Barre Fire Department conducted flow testing on its apparatus on Wednesday, part of the department’s regular maintenance and readiness program.
Flow testing ensures that each piece of fire apparatus delivers the proper water pressure and volume during operations. These checks are critical for both firefighter safety and effective fire suppression.
By staying on top of preventive maintenance and performance testing, Barre Fire continues to keep its fleet in peak condition, ready to respond when the community needs them most.