Mid-Atlantic Rescue Systems, Inc.
 

Main Content

Features

Lewiston Fire Station 4

This article is a direct street report from our correspondent and has not been edited by the 1st Responder newsroom.

Lewiston Engine 4 moved into their new 3-bay firehouse in 2021. The 9192-square-foot facility was built by Great Falls Construction for $4.7 million. This building features three large drive through bays, modern living quarters with a gym, and training facilities. The prior station 4, a much smaller building built in the 40's, was acquired by Casco Bay Electric.

avatar image
CHUCK LOWECorrespondent

No information from the author.