Main Content

Features

Alton Engine 2

This article is a direct street report from our correspondent and has not been edited by the 1st Responder newsroom.

The Alton Fire Department has recently received a 2025 E-One Typhoon pumper with a 1500 GPM pump and a 2500-gallon water tank for Engine 2. This new apparatus replaces a 2004 E-One Cyclone with the same capacity.

avatar image
CHUCK LOWECorrespondent

No information from the author.