Features
Alton Engine 2
May 30, 2025 | NEW HAMPSHIRE
CHUCK LOWE, Correspondent

Photo by Chuck LoweFormer Alton 1-E2

Photo by Chuck LoweNew Alton 1-E2
This article is a direct street report from our correspondent and has not been edited by the 1st Responder newsroom.
The Alton Fire Department has recently received a 2025 E-One Typhoon pumper with a 1500 GPM pump and a 2500-gallon water tank for Engine 2. This new apparatus replaces a 2004 E-One Cyclone with the same capacity.