Web
www.1RBN.com
July 30, 2010
Sign In
|
Get Registered
Product & Services
FIREFIGHTING EQUIPME...
Absolute Fire Protec...
sales@absolutefire.com
http://www.absolutefire.c...
View All
National News
|
State News
|
Video/Audio News
|
Columns
|
Features
|
Trade Shows
|
Calendar Events
|
Products & Services
|
Vehicles
|
Forums
|
Contact
To immediately access any story, please enter the Story Number in the above box.
Ladder Truck
GovDeals
Simon-LTI
1987
ONLINE AUCTION – ENDS AUGUST 31st. For full detai
Download the 2010 issue of 1st Responder Broadcast Network Media Kit.
If you want to see your department’s activities in
the newspaper and on the Internet, as a 1RBN Correspondent you have the powers to make that happen.
New Jersey
Lodi battles stubborn house fire
By BILL TOMPKINS
Correspondent
1st Responder Newspaper
Story Number
031110114
By BILL TOMPKINS – BTFirephotos.com
By BILL TOMPKINS – BTFirephotos.com
By BILL TOMPKINS – BTFirephotos.com
By BILL TOMPKINS – BTFirephotos.com
By BILL TOMPKINS – BTFirephotos.com
LODI, NJ - Firefighters from Lodi and numerous surrounding departments fought a fire in a dwelling that took over three hours to control as they chased the flames hidden in the walls on March 11, 2010.
The Lodi Fire Department was dispatched at about 12:50 a.m. for a report of a fire at 70 James Street. First in police units reported smoke and fire showing which was confirmed by fire officers on their arrival. A second alarm was transmitted bringing mutual aid to the scene and for cover. Visible fire on the first floor was quickly knocked down, but the smoke condition showed that the flames were in the walls of the balloon frame structure.
With the obvious amount of labor intensive opening up that needed to be done, additional units were called to the scene. Flames seemed to be everywhere as companies opened up. At one point, heavy fire extended through a vent hole in the roof of a rear extension and later on through a dormer on the “D” side. Operations remained offensive throughout the duration of the job.
The fire was able to be placed under control at about 4:00, and overhaul would last several hours longer.
Balloon frame construction would come back to haunt firefighters as companies were called back for a rekindle at about 8:00.
No serious injuries were reported.
More News From This State
©2009
Belsito Communications Inc.
Need to contact us? -
CONTACT US